Residential Developer — Cloacina | Revolutionary Package Wastewater Treatment Systems

FOR TECHNICAL SUPPORT OR TO REQUEST PARTS, PLEASE CLICK HERE

Please note: This website includes an accessibility system. Press Control-F11 to adjust the website to people with visual disabilities who are using a screen reader; Press Control-F10 to open an accessibility menu.
CookieBot
Zoom Info code injection

DESIGN PARAMETERS

Cloacina was selected to expand the existing packaged wastewater plant, adding 150,000 Gallons Per Day (GPD) of treatment capacity through a comprehensive design-build scope. This included site construction and the fabrication and supply of a 150,000 gpd MEMPAC-M packaged Membrane Bioreactor (MBR) system. The Developer needed an efficient, cost-effective solution to increase capacity while maintaining high water quality standards for TCEQ reuse requirements.

The Cloacina Difference

Cloacina delivered substantial completion within 356 days through efficient, concurrent site construction and system fabrication. In partnership with GSE, we handled the installation seamlessly, integrating with the existing infrastructure. The expanded system now meets TCEQ standards for reuse, offering Crown Community Development a sustainable, high-performing wastewater treatment solution.

CLOACINA SUPPLIED THE
FOLLOWING FOR THIS PROJECT: